亚洲国产国产亚洲一二三_视频一区免费_九色丨porny_无码专区视频中文字幕_在线播放亚洲视频_香蕉视频在线精品视频

Muen
News

News

Enterprise service provider

location : Home > News > Technical information

What to check before the soft starter is powered on?

2023-05-20 11:27:04

Soft starter is a novel motor control device that integrates motor soft start, soft stop, light load energy saving and multiple protection functions. It is called Soft Starter abroad. The domestic soft starter is the most famous Heping hps2 series soft starter. Its main composition is a three-phase parallel thyristor and its electronic control circuit connected in series between the power supply and the controlled motor.


The soft starter we use needs to be powered on. Generally, we need to check before power on before use. Let's take a look with the editors below to see which ones to check:


First, check the wiring


1. Check whether the wiring is correctly connected in accordance with the requirements of the product instruction manual, especially pay attention not to connect the output terminals (U, V, W) to the three-phase power supply.


2. Check whether the installation is normal and whether the grounding is correct and reliable. Especially for the control circuit wiring (such as the given signal line and feedback signal line on the input side, the frequency signal line and current signal line on the output side, the switch signal control line, etc.), it is necessary to keep away from the main circuit (more than 100mm) and shield Anti-interference measures. The shield of the cable should be connected to the common end (COM) of the control circuit near the inverter. Do not connect to the ground (PE) of the inverter. The other end of the shield should be suspended.


3. Check whether the brake unit wiring is correct. When connecting an external braking resistor (some inverters have a built-in braking resistor, when the capacity is insufficient, an external braking resistor is required), first remove the wiring of the built-in braking resistor from the P (+) and DBd terminals, and The wire end is insulated, and then the external braking resistor is connected to P (+) and DB. It is required that the wiring length is less than 5M, and twisted pairs are used.


4. Check whether the DC reactor wiring is correct. Note: Short-circuit conductors are connected to the connection terminals P1 and P (+) when leaving the factory. When using a DC reactor, this short-circuit conductor should be removed; if a DC reactor is not used, the short-circuit conductor can be connected at both ends of the reactor.


2. Check AC power. For three-phase inverters, the three-phase AC power supply voltage should be within the allowable range (such as 340-440v). Overvoltage and undervoltage are strictly prohibited.


Third, check the motor


1. Use a 500V-1000V megohmmeter to measure the insulation resistance of the motor winding to the shell, which should not be less than 5 megohms. If the insulation resistance is less than 2 megohms or the winding has been in contact with the shell, it is strictly prohibited to use the inverter. Otherwise, the inverter will be damaged.


2. Measure the DC resistance between the three windings of the motor, which should be balanced in three phases, and the resistance between the windings of each phase is ohms. If the resistance is too small or zero, it means that there is a short circuit in the motor winding, and it is strictly forbidden to use it.


In general, when we check the power of the soft starter, we also need to pay attention to the above points to reduce failures due to power problems during use.


通用變頻器


label

QR code

The public,

Mobile station
The public, Mobile station

Contact

未標(biāo)題-8.png 0755-81719517
未標(biāo)題-10.png0755-81719530 未標(biāo)題-11.pngamb@ambition.com.cn
未標(biāo)題-12.pngFloor 1, 5 and 6, building 7, lijincheng science and technology industrial park, gongye dong road, longhua new district, shenzhen

Navigation

Home          About

Product      Case

Solution      Service

Job      News

Contact          

Copyright © Shenzhen Ambition Electronic Co., Ltd Record number:備案號:粵ICP備12045920號
主站蜘蛛池模板: 久久99草| 全球金属网上海有色金属价格行情 | 欧美一区二区二区 | 黄色免费网站在线 | 91看片麻豆 | 夜夜艹图 | 二区三区在线视频 | 亚洲伊人久久影院 | 长江有色金属最新报价 | 91精品中综合久久久婷婷 | 国产麻豆久久久 | 我要看a级片 | 国产中文字幕在线播放 | 熟妇好紧好大快点舒服使劲xh | 日韩无限资源 | 欧产日产国产水蜜桃 | free性videoxxⅹ欧美hd | 老女人任你躁久久久久久老妇 | 看全色黄大色黄大片大学生 | 五月天开心激情 | freexxxx女hdpiss| 欧美日韩在线观看αv | 人禽l交视频在线播放 视频 | 广东美女一级毛片 | 久久伊人艹 | chinese耄耋老妇性hd | 在线免费日韩av | 性少妇video| 九九午夜视频 | 天天操天天爽天天干 | 亚洲国产系列一区二区三区 | 国产精品黑色丝袜在线观看 | yw855.ccm免费观看网址 | 字幕网资源yellow在线观看 | 狠狠色婷婷丁香六月 | 香蕉综合网 | 亚洲av激情毛片九色一区 | "www 黄色"| 亚洲色欲一区二区三区在线观看 | 97理论片手机在线观看 | 看a网站 |